Tasks
Devan 22 Jul 2010 17:23
# installation of the DS2480 onto the battery board
# install RF jumpers between the Radio and Antenna boards
# build the TNC (Kantronics 3+) to ground radio (Kenwood TH-F6A) interface cable
# finish the basic flight code to include (Cmd and Tlm via RF, sample each sensor, activate textspeak payload)
# Review proposed solution to integration of Launch Switch into the power bus (located in Hardware Integration Issues)
# Verify that our revision of the FM430 board provides the 3.3V onto the H1/H2 connector stack [22 JUL 2010 - jrb]