Tasks
Devan 22 Jul 2010 17:20
- will coordinate a time to begin on Saturday 7-24-10
- obtain one of the new populated payload boards and bring it to the lab from the ECWC
- determine the part value to tune the Antenna board (Kemp/Doherty/McGlothlin)
- Generate a board status (by serial number) to indicate state of assembly and test
- generate the electrical drawing for TVac cables and have them made
- work through the 5-pin power connections from each array for final assembly - this may mean a hand built jumper
- Notify others of teleconference Friday 7-23-10
- Send Mr. Brunschwyler Alishan, and Wills (and Kristina's?) email addresses