Critical Design Review (CDR) - June 8, 2008

Orbital Presentation Requirements (Check for redundancy)

  • Be sure that the mission overview is rock solid as it sets the tone for the rest of the program
  • In the current design section, start with the system design (in fact you can call that section "Systems"). In addition to the spec and block diagram, have the students have 2-3 slides on the concept of operations. For instance, what does a day in the life of TJSat look like. A diagram or even a timeline would help. Again, this gets everyone on the same page and avoids questions later on.
  • Spacecraft Subsystem overview. Recommend the following order, as makes it flow better: Structure, C&DH, Telecom, Power
  • Break testing into its own top-level section and call it Integration and Test
  • I&T should also talk about the facilities you have at school for assembly of the satellite
  • Rename Ground Station into "Mission Ops", as it covers more than just the ground station
  • I'm not sure what the Science and Instrumentation section is presenting? Is this another payload? What is the C&DH listed there? Is that the main C&DH? If so, that portion should go up as spacecraft subsystem, and the top-level section maybe is just the payload
  • Critical Issues and Future work. I've seen these both summarized at the end, or at the end of each subsection. I personally find that having both at the end of each subsection is best as it allows the relevant parties to answer any questions. So I would have in each section a "Risks and Critical Issues" chart and a "Future Work Chart". Then perhaps in the CDR Conclusions chart I would simply summarize the most important.
  • I'd leave out finances for this review, focus on the technical, since you have plenty already!

Student Presentation Overview

  • Project Overview
    • CubeSat Program and Constraints
    • Mission Overview, Mission Success Definition
    • Developers and Partners
    • Project Organization
      • Director, Thermal, Telecom, Structures, Testing, Power, Software, Hardware, Ground Station
    • Schedule
      • Project Timeline
  • Current Design and Progress
    • Payload Configuration
      • Interface for each subsystem
      • Overview
      • Textspeak power consumption
    • System Design
      • Basic Specifications
      • Block Diagram
  • Subsystem Overview
    • Testing
      • Vacuum chamber testing
      • Vibration Testing
      • Battery Testing
      • ALL SUBSYSTEMS CHECKED!
    • Thermal
      • Thermal expansion rates
      • Performance in temperature extremes
    • Telecom
      • Block Diagram for Uplink and Downlink
      • Packet Sizes and Composition
      • System Diagram broken into Telemetry, Beacon, and Uplink
      • Hardware specs
      • Flow layout transfer and receive
      • Antennae configuration
        • Antenna Absolute Gain Graph for Transmit and Receive
      • Link Budget, Telemetry and Uplink
    • Structures
      • Chassis
        • Assembly
        • Weight and center of mass
        • Material
        • Size
      • Interface
        • Remove before Flight pin
        • External I/O
        • Connector
      • Antennae
        • Deployment, nylon polymer
      • Analysis
        • Ceiling Vibration
        • Load Estimation
        • Antennae Vibration
    • Power
      • System overview diagram
      • Overview requirements
      • Hardware overview
        • Battery and solar panels
      • Solar array layout and design for all axis x,y,and z
      • Energy consumption and budget
    • Ground Station
      • Commands from GS
      • Simulated pass time for a day to a week
      • Analysis of pass time
      • Time allotted for communication
      • Operation plan, block diagram/chart
      • Deciphering downlink
      • Equipment overview
      • System overview diagram
    • Science and Instrumentation, Hardware, Software, C&DH
      • Health monitoring
        • Diagram of Information Sent
      • C&DH
      • Sensors
        • Block Diagram of Circuit Layout
        • Microcontroller and Memory Storage
        • Thermal Monitoring, graph for calibration Curve
        • Circuit Diagram for System Reset
  • Critical Issues
    • Concerns based on subsystems
  • Finances
  • Future Work
    • Plans to complete tj3sat
    • Work Room Environment